Safety Measurement System (SMS)
SMS #1 | |
---|---|
USDOT Number | 3090484 |
Total Inspections | 2 |
Total Driver Inspections | 2 |
Total Driver OOS Inspections | 1 |
Total Vehicle Inspections | 1 |
Total Vehicle OOS Inspections | 1 |
Unsafe Driving Inspections with Violations | 0 |
Unsafe Driving Measure Value | 0 |
Unsafe Driving Acute/Critical Indicator | N |
Inspections with Violations | 0 |
Driving Measure | 0 |
Hos Driv Ac | N |
Driver Fitness Inspections with Violations | 0 |
Driver Fitness Measure | 0 |
Driver Fitness Serious Violation Indicator | N |
Controlled Substances Inspections with Violations | 1 |
Controlled Substances Performance Measure | 7.5 |
Contr Subst Ac | N |
Vehicle Maintenance Inspections with Violations | 1 |
Vehicle Maintenance Measure | 30 |
Vehicle Maintenance Acute/Critical Indicator | N |
There are no Crash data associated with CRITICAL PATH LTD.
Inspections
Inspection #1 | |
---|---|
Unique ID | 606697029 |
Report Number | 1093002369 |
Report State | CO |
USDOT Number | 3090484 |
Inspection Date | 15-JUL-19 |
Inspection Level ID | 2 |
Inspection State | CO |
Time Weight | 2 |
Driver OOS Total | 0 |
Vehicle Oos Total | 0 |
Total Hazmat Sent | 0 |
OOS Total | 0 |
Hazmat Oos Total | 0 |
Hazmat Placard Required | |
Type | STRAIGHT TRUCK |
Make | INTL |
License | VAO914 |
License State | CO |
VIN Number | 1HTGHADT82H500383 |
Decal Number | |
Type 2 | |
Make 2 | |
License 2 | |
State 2 | |
VIN 2 Number | |
Decal Number 2 | |
Unsafe Inspection | Y |
Fatigued Inspection | Y |
Driver Fitness Inspection | Y |
Substances/Alcohol Inspection | Y |
Vehicle Maintenance Inspection | Y |
Hazmat Inspection | |
Basic Violations | 2 |
Unsafe Violations | 0 |
Fatigues Vilations | 0 |
Driver Fitness Violations | 0 |
Substances/Alcohol Violations | 0 |
Vehicle Maintenance Violations | 2 |
Hazardous Materials Compliance Violations | 0 |
Violations
Violation #1 | |
---|---|
Unique ID | 606697029 |
Inspection Date | 15-JUL-19 |
USDOT Number | 3090484 |
Violation Code | 3939 |
Name | Vehicle Maintenance |
OOS Indicator | N |
OOS Weight | 0 |
Severity Weight | 2 |
Time Weight | 2 |
Tot Severity Wght | 2 |
Viol Value | 4 |
Violation | Inoperable Required Lamp |
Violation Group | Clearance Identification Lamps/Other |
Vehicle Unit Violation | 1 |