Company Overview
CRITICAL PATH METALWORKS INC is a motor carrier operating under USDOT Number
2287346 in
Colorado. It has a total of
1 trucks and 2 drivers. The company
received its MCS number on 06-JUN-16.
CRITICAL PATH METALWORKS INC is allowed to operate Intrastate Only (HM) and
Intrastate Only (Non-HM).
CRITICAL PATH METALWORKS INC is not allowed to carry hazardous
materials.
According to our records, in 2015
CRITICAL PATH METALWORKS INC company drivers travelled
25000 miles
and had a total of 1 inspections and
1 out of which were with violations. This transportation
company drivers had 0 crashes with
0 crashes involving a fatality.
Our records also indicate that CRITICAL PATH METALWORKS INC company vehicles
passed 1 inspections during the period of their
operation.
Their last vehicle inspection was on 01-NOV-18
Overall we have 1 traffic violation reports in our
system.
Their last traffic violation was recorded on 01-NOV-18
Total Trucks |
1 |
Total Drivers |
2 |
USDOT Number |
2287346 |
MCS 150 Year |
2015 |
MCS 150 Date |
06-JUN-16 |
MCS 150 Mileage |
25000 |
Does CRITICAL PATH METALWORKS INC transport Hazardous Material? |
No |
Carrier Operation |
C |